Phase 2 would have to be named as 9.0 as it contains major enhancements to the system, keeping in inline with the standards chosen to be used by you.
Project to be performed in 2 equally complex phases, each phase to deliver to production about 4 months apart. The project has been identified as 8.0. Our baseline naming convention says change the first number for a major enhancement/upgrade. If the first baseline is named to coincide with the project (8.0), then what name/identifier do I give to the baseline when phase 2 is ready?